From feasibility to a running line.

Our hands-on process covers the entire film-line lifecycle — from the first feasibility study to commissioning, training and long-term optimisation.
FMS engineers assembling a Brückner BOPP film line roller on site
FMS engineers assembling a Brückner BOPP film line roller on site

Our step-by-step approach.

Our step-by-step approach.

FMS engineer marking up a film-line frame during assembly

01

Feasibility study

We assess your investment against current material and film prices and product costs, then recommend the right line, capacity and configuration.

01

Feasibility study

We assess your investment against current material and film prices and product costs, then recommend the right line, capacity and configuration.

02

Plant layout & sourcing

We design a cost-effective plant layout with room for future expansion, and source new lines from original manufacturers or reassess used ones.

02

Plant layout & sourcing

We design a cost-effective plant layout with room for future expansion, and source new lines from original manufacturers or reassess used ones.

03

Dismantling & shipment

For relocations, we dismantle, pack and container-load complete lines, slitters, metallizers and utilities for safe transport to the new site.

03

Dismantling & shipment

For relocations, we dismantle, pack and container-load complete lines, slitters, metallizers and utilities for safe transport to the new site.

04

Assembly & installation

Our experienced erection supervisors reassemble and integrate the line, utilities and cranes on site — with safety and precision.

04

Assembly & installation

Our experienced erection supervisors reassemble and integrate the line, utilities and cranes on site — with safety and precision.

05

Commissioning & start-up

We check, commission and start up the line to full performance, then train your operators and technicians to run it.

05

Commissioning & start-up

We check, commission and start up the line to full performance, then train your operators and technicians to run it.

06

Upgrading & auditing

Over the line's life we raise productivity, cut waste, benchmark KPIs against global averages, and recommend the upgrades that pay off.

06

Upgrading & auditing

Over the line's life we raise productivity, cut waste, benchmark KPIs against global averages, and recommend the upgrades that pay off.

Our team

The engineers behind every project.

The engineers behind every project.

Fatih Seyhan
Fatih Seyhan

Managing Partner · Electronics Engineer

Fatih Seyhan
Fatih Seyhan

Managing Partner · Electronics Engineer

Samim Sümer
Samim Sümer

Technical Director · Mechanical Engineer

Samim Sümer
Samim Sümer

Technical Director · Mechanical Engineer

Enis Tanık
Enis Tanık

Site & Project Manager · Automation

Enis Tanık
Enis Tanık

Site & Project Manager · Automation

Ahmet Özen
Ahmet Özen

Senior Production Engineer · BOPP & CPP

BOPP film production line

Planning a film line project? Let's talk.

Whether you're investing in a new BOPP or BOPET line, relocating one, or improving an existing plant, FMS can help. Get in touch for a conversation with our engineers.

BOPP film production line

Planning a film line project? Let's talk.

Whether you're investing in a new BOPP or BOPET line, relocating one, or improving an existing plant, FMS can help. Get in touch for a conversation with our engineers.