PIRAN POLYMER line relocation
Relocation, assembly, maintenance, check-up and commissioning of an 8.2m, 30,200 t/year Brückner BOPP line with Atlas slitter, from China to PIRAN POLYMER, Iran (2019–2022).

Overview
A high-capacity 8.2m Brückner BOPP line relocated from China and brought online in Iran.
Scope
Dismantling, packing and shipment from Zhaoqing Xintianyi, China
Assembly, maintenance and check-up at Piran Polymer
Commissioning to full production (2021–2022)
Outcome
A 30,200 t/year line successfully re-established and running.









